Garibaldi Pumice - Industrial mineral products

Golden Ears Connector, PMH1

176th Street and 104th Avenue, Surrey, BC

Garibaldi Pumice has provided over 20,000 cubic metres of dacite pumice lightweight fill (lwf) material for the Port Mann/Highway 1 Improvement project. Recently, the Company provided just over 5000 cubic metres of dacite lwf for the Golden Ears Connector (GEC). The GEC is a BC Ministry of Transportation and Infrastructure project built to link the Golden Ears Bridge and Highway 17. During the project a test section was completed (photos below). Compactive effort requirements for our lwf were assessed by testing material after 0, 2, 4, 6 and 8 passes of a roller compactor. The in-place, saturated surface-dry density of Garibaldi’s lwf was determined to be approximately 800 kg/m3 after sufficient machine compaction (4 passes). A full description of testing is available upon request.

Click thumbnails to enlarge.

604 558 1384

info@garibaldipumice.com

Garibaldi Pumice Ltd. PO Box 1324, Garibaldi Highlands, BC V0N 1T0

© 2010 Garibaldi Pumice. All rights reserved. Squamish Web Design : Goodwin Studios. Powered by Website Baker